Transcribe
Translate
James A. Van Allen lab journal, September 1959-January 1961
Page 57
More information
digital collection
archival collection guide
transcription tips
Also saw F 101 production line (~ 1/day) and F 4 H (Phantom II) (~ 1/week) and Mercury capsule design and construction area (total order of 20 capsules on order). I got into the Mercury capsule mockup -- and received an explanation from Mr. Yardley of the operation of the various meters, lights, controls, etc.
Saving...
prev
next
Also saw F 101 production line (~ 1/day) and F 4 H (Phantom II) (~ 1/week) and Mercury capsule design and construction area (total order of 20 capsules on order). I got into the Mercury capsule mockup -- and received an explanation from Mr. Yardley of the operation of the various meters, lights, controls, etc.
Van Allen Papers
sidebar